If you're planning building work in the ACT, you will usually need building approval before starting. Here's what you need to know.
Before Building Approval
Before we can start the building approval process, you will typically need to provide the following documents.
Proof of Ownership
Rates Notice, Valuation Notice, or an application to register or transfer a Crown Lease.
Architectural Drawings
Prepared in accordance with AS1100 Technical Drawing General Principles.
Site Soil Classification
Prepared by a structural or geotechnical engineer in accordance with AS2870.
Structural Engineering Drawings
A full set of structural engineering drawings for the proposed works.
Energy Efficiency Report
An Energy Efficiency Report (EER) or Glazing Calculator for the proposed works.
Asbestos Survey (if applicable)
Required for demolition, additions or alterations to dwellings built prior to 1990.
Neighbour Notification Forms
Forms 7A and 7B required for works in existing suburban areas.
Appointment of Certifier
A signed and completed Application for Building Approval.
Before Construction Begins
Before a Building Commencement Notice can be issued, you will also need to provide the following.
Appointment of Builder
Application for Commencement Notice including builder appointment details.
Home Owners Warranty Insurance
Provision of a valid Home Owners Warranty Insurance Certificate.